Water Supply
24x7 Water Supply Project
THE KARNATAKA URBAN INFRASTRUCTURE DEVELPOMENT AND FINANCE CORPORATION.
The World Bank assisted Karnataka Urban water Sector Improvement Project (KUWASIP) is a key project being implemented by KUIDFC,KUWS and City Corporation Belgaum. This is the first phase of a long-term programme to improve and bring in reforms in the water and sanitation sector in Karnataka.
It is a path-breaking project in the water supply and distribution sector in India. For the first time, the expertise of the private sector is being harnessed to improve the system of water supply and also increase the efficiency in operations of water distribution in small areas of select project cities in the state.
1. Government of Karnataka with assistance from the World Bank has launched the Karnataka Urban Water Sector Improvement Project (KUWASIP) to bring initial Improvements in water supply in three Urban Local Bodies (ULB) i.e. Gulbarga, Belgaum and the twin cities of Hubli-Dharwad. The cost details of the project is as follows:
| World Bank Aid. |
Rs. 181.70 Crores
|
| Govt. of Karnataka Investment |
Rs. 55.34 Crores
|
| Total Project cost |
Rs. 237.04 Crores
|
KUWASIP INVESTMENT DETAILS: (in Rs. Crores)
|
Sl No.
|
Works
|
Amount
|
|
1
|
Priority Investment works |
119.94
|
|
2
|
Demo zone works |
19.40
|
|
3
|
Technical Assistance & studies |
11.73
|
|
4
|
Support for Project Implementation |
8.02
|
|
5
|
Others |
77.95
|
| Total |
237.04
|
ULB wise INVESTMENT FOR WORKS (Amount in Rs. Crores) :
|
ULB
|
For PI Works
|
For Demo zone works
|
Total Investment
|
| Belgaum |
36.05
|
6.32
|
42.37
|
| Gulbarga |
45.37
|
4.46
|
49.83
|
| Hubli-Dharwad |
38.52
|
8.62
|
47.14
|
| Total Amount |
119.94
|
19.40
|
139.34
|
Urban Local Bodies (Corporation of the city of Belgaum):
The Corporation is the owner of all the properties and information given at the beginning of the take
over of Demonstration area to the Operator and also that which is generated by the Operator, at the end of
the O & M period, of 24/7 system operation.
KUWS&DB (Priority Investment works):
Karnataka Urban Water Supply and Drainage Board (KUWS&DB) has carried out the
priority Investment works to improve the bulk water supply to the three cities, by means of selected
replacements or improvements to Bulk water supply infrastructure, principally directed at reducing leakage
from transmission systems.
CGE – Operator (Demonstration zone works):
Compagnie Generale Des Eaux (C.G.E) and Seureca, the operator appointed to carryout the
improvements in distribution system in selected parts of the three cities, with the key objective of
demonstrating that continuous, pressured, supply of water is possible.
Fichtner (Technical Auditor) :
KUIDFC has procured the services of Technical Auditor, Fichtner Consulting Engineers India
Private Limited. The Technical Auditor will independently review and monitor the PI & Demonstration
project.
Demonstration works – Agency - Compagnie Generale Des Eaux (C.G.E) and Seureca
|
Statistics of Belgaum North & South Demo zone
|
||||
|
S.No.
|
Details
|
North
|
South
|
Total
|
|
1
|
Cost of the Project (in Crore) |
4.713
|
4.643
|
9.356
|
|
2
|
No. of Wards |
4
|
6
|
10
|
|
3
|
No of Properties |
4017
|
3501
|
7518
|
|
4
|
Population covered |
37857
|
41060
|
78917
|
|
5
|
Estimated quantity of water (MLD) |
4.842
|
5.138
|
9.98
|
|
6
|
Length of pipeline (Km) |
49
|
39
|
88
|
|
7
|
Range of pipe dia (mm) |
63 to 315
|
63 to 508
|
|
|
8
|
Pipe material and Jointing methods |
PE, Butt &
Electrofussion |
MS & PE, Butt &
Electrofussion |
|
|
9
|
Fittings used | |||
| Full bore Electro flow meter with data logging facility |
6
|
6
|
12
|
|
| Pressure control valves with data lagging facility |
6
|
2
|
8
|
|
| Sluice valves |
107
|
95
|
202
|
|
| Scour valves |
3
|
2
|
5
|
|
| Air Valves |
2
|
3
|
5
|
|
|
10
|
Booster pumping station |
0
|
1
|
1
|
|
11
|
Emergency Chlorination unit |
1
|
1
|
2
|
|
12
|
24x7 Customer care center |
1
|
1
|
2
|
|
13
|
Billing & Collection on monthly volumetric basis |
1
|
1
|
2
|
|
14
|
Leak detection & repair | As and when required | As and when required | |
|
15
|
Water quality testing( On spot Residual chlorine test and Bacterilogical test in two laboratories) |
Twice in a week (Residul chlorine test 1at source point and 1at dist consumer point, 4 samples for Bacteriological test - 2 samples from source point and 2 samples from dist consumer point | Twice in a week (Residual chlorine test 1at source point and 1 at dist consumer point, 4 samples for Bacteriological test - 2 samples from source point and 2 samples from dist consumer |
Total 8 samples test for residual chlorine and 16 samples test for Bacteriological test. |
|
Technical details of 24 / 7 Demo zones of Belgaum |
|||||
|
S.No |
Details |
North |
South |
Total |
Reference |
|
|
No. of properties |
4017 |
3501 |
7518 |
Survey data |
|
|
Authorized house service connections |
4004 |
4309 |
8313 |
B&C database |
|
|
Frequency of supply |
24 hrs. |
24 hrs. |
24 hrs. |
Flow data & Baseline parameters |
|
|
Estimated quantity of water (MLD) |
4.842 |
5.138 |
9.98 |
FIP |
|
|
Volume of water supplied (Mld) |
4.375 |
3.716 |
8.091 |
Baseline parameters |
|
|
Physical losses |
12% |
4.50% |
|
Flow data & other documents |
|
|
System pressures (m) |
6 to 20 |
6 to 20 |
|
from Pressure data in present system |
|
|
24 hrs Customer care center |
1 unit |
1 unit |
2 units |
Complaint data from customer care center. |
|
|
Complaint redressal |
100% within time frame |
100% within time frame |
100% within time frame |
Dabase of CCM |
|
|
water meter test bench |
1 unit |
1 unit |
|
|
|
|
Billing |
100% - Monthly - Volumetric |
100% - Monthly - Volumetric |
100% - Monthly - Volumetric |
B&C database. |
|
|
Revenue collection |
> 90% |
> 90% |
> 90% |
DCB statement |
|
|
Leak detection & Repair |
In context with MNF |
In context with MNF |
|
MNF ( minimum night flow ) details |
|
|
Monitoring of Flow & pressures in the system |
EMFM & Data loggers |
EMFM & Data loggers |
|
Flow & pressure data in demo zones, |
|
|
Public Stand posts |
Nil |
Nil |
Nil |
|
|
|
Average per capita consumption (lpcd) |
90 to 100 |
80 to 90 |
|
Flow data in demo zones, |
|
|
No. of valve operations per day |
Nil |
Nil |
Nil |
|
PRIORITY INVESTMENT WORKS – Agency - Karnataka Urban Water Supply and Drainage Board (KUWS&DB) Improvement of Bulk water to Belgaum city
|
Packages |
Details of works |
Cost of |
Status of work |
|
Packages-I BGW01 |
1) 1100 mm PSC gravity main pipeline from Rakaskoppa to Hindalaga pumping station. 2) 1000 mm DI Rising main pipeline from Hindalaga pumping station to Laxmitek WTP. service road. |
13.83 |
Commissioned |
|
Package-II BGW02 |
1) 1168 mm x 9 mm thick MS pipeline from Kundargi Pumping station to Tumarguddi Pumping station. 2) 508 mm x 6.4 mm thick MS pipeline from Hindwadi to Angol road. 55LL. |
17.89 |
Commissioned |
|
Package-III HBG01 |
Installation of (2+1) 600 HP pump sets and accessories at Hindalga pumping station – commissioned. |
2.21 |
Commissioned |
|
Additional works of Package-II BGW02 |
1) Construction of 15 LL OHT 2) Construction of 1LL Sump 3) 525 mm / 500 mm CI / DI pipeline – 5.30 kms
4) 200 mm DI pipeline for 1.40 km |
2.89 |
1) Finishing stage 2) Commissioned 3) testing under progress |
|
Package-III HBGG01 |
Installation of Mechanical floe meters – 12 nos |
0.43 |
Under progress |
|
|
Total cost |
37.25 |
|
Raw water pumping
|
Number of Raw water source ( Rakaskoppa & Hidkal ) |
2 |
|
Total quantity of Bulk water pumped from source – Rakaskoppa |
12 MGD |
|
Total quantity of Bulk water pumped from source – Hidkal |
12 MGD |
|
Quantity of Raw water directed to Beneficiaries ( Beneficiaries are HINDALCO factory, KLE Hospital, Markandya sugar mills, ZP villages) |
6 MGD |
|
Quantity of Raw water reaching Water treatment Plant |
18 MGD |
AGUMENTATION OF WORKS
1. Construction of 15 LL Over head tank at TB ward (Hospital premises)
2. Construction of 1 LL sump cum pump house at TB Ward premises.
3. Lying of 200 mm DI pipeline from Sump near Utsav Hotel to Channamma nagar over head tank.
4. Laying of 525 mm CI / 500 mm DI pipelines from Laxmitek to Gummatmal GLSR.
PHOTOGRAPHS

Construction of intake tower & RCC Foot Bridge under KUWASIP at source Rakaskoppa reservoir

PSC pipe laying works from Rakaskoppa reservoir to Hindalaga pumping station under package BGW01

Service road along PSC pipe line from Rakaskoppa reservoir to Hindalaga pumping station

Laying of MS pipe line with sand bidding cushion in black cotton soil strata from Kundargi pumping station to Tummerguddi pumping station of Hidkal source to Laxmitek WTP under KUWASIP

MS pipe line works completed from Kundargi pumping station to Tummerguddi pumping station of Hidkal source to Laxmitek WTP under KUWASIP

Water of Rakaskoppa reservoir been received at sump of Hindalaga pumping station.

55 Lakh liters Ground level service reservoir constructed at Laxmitek to augment water for city

15 Lakh liters Over head service reservoir under construction at TB ward hospital premises exclusively meant to augment water for North demo zone

Butt Welding for HDPE pipes for works carried under demo zone pipe laying

A typical tap with water meter for individual customer

Pressure control valve (PCV) being used for in demo zone to control required water pressures